Skip to Main Content
TrackIt Ideas

Idea and discussion portal for the TrackIt product line. Users may submit, view and vote on ideas submitted by all users.

ADD A NEW IDEA

Pinned ideas

PINNED Individual Payroll Hours Viewable
Is there a way or an option for Site users to only be able to access their own hours or selected peoples hours instead of giving them access to everyone in the company's hours.? I have some batchmen who login and logout thru the website and are no...
PINNED Weekly Time Cards - option to sort by last name
The employee list will only sort by the employee # default or by first name. There isn't an option to sort by last name and this makes it difficult to find employees in a consistent manner.

TrackIt

Showing 315 of 315

Distracted Driving caused by messages coming in on tablet

With distracted driving is becoming an increasing concern we need to improve the logic to lock out drivers from the tablet while still not impeding other activities. Example of no messaging while the truck is moving. The truck does stop at stop si...
Marco Adamo over 6 years ago in TrackIt Android Application 2 Reviewing

Different Colored Hot Spots

We need to label many different hotspots on our map, and it is hard when you look at it at a whole to see all the red, i was wondering if there can be an option of adding a color, so that we can differentiate what the hotspot means, such as; Purpl...
Guest about 2 years ago in TrackIt Equipment Map 0 Reviewing

Show Driver start time for next day in clockout screen

Is there a way to show the driver(employee) start time for the next day on the same screen that shows the daily/shift/weekly hours after they have clocked out? The scheduled start time for each driver would have to be entered and saved before the ...
Craig Thornton over 6 years ago in Scheduling 0 Future consideration

Employees scheduled at a location other than their default does not populate times or location to scheduling.

Currently times and locations other than default does not populate to TrackIt from Command DRCI. With multiple load points in close proximity we often have personnel start where there is available equipment to operate rather than moving the equipm...
Cory Thomas about 2 years ago in Scheduling 0 Reviewing

Bulk messages from emailed / texted schedules

It will be useful to dispatch for a number of reasons. If we have the ability to add messages to entire groups that could be attached to scheduling, we can notify personnel of expectations outside of normal duties at the beginning of a shift. It i...
Cory Thomas about 2 years ago in Scheduling 0 Reviewing

VERIFY THAT TRUCK IS AT THE RIGHT JOB BEFORE STATUS IS CHANGED TO "AT jOB"

Drivers possibly goes to wrong job site and pours out. When the truck enters the geo fence TrackiIt reports "At Job" By definition it's correct. Its at "A Job", might not be the right job, and on occasion it's not. If driver is not at the correct ...
Guest over 3 years ago in  1 Scheduled

Leftover Concrete Report

Please add a new report for concrete leftovers. It is a very critical part of the systems and will help in better manager the returns. Ideally, we would prefer the following columns. DATE ORDER # CUSTOMER PROJECT MIX TRUCK # M3 TIME
Manjot Singh about 5 years ago in TrackIt Reports 0 Reviewing

Preferences: Map View

Allow users to set preferences for or retain the last selected options for Map view (Road, Arial, Hybrid) Allow users to set preferences for or retain the last selected options for Map view for Traffic.
Guest over 1 year ago in User Setup/Permissions 0 Reviewing

NEED WEATHER INFO ON MAP

No description provided
Guest about 3 years ago in TrackIt Equipment Map 0 Reviewing

GeoGate Email/SMS Alerts

Having the ability to create a GeoGate and add in the fuctionality of having it send an SMS or Email when the event is triggered. One example is to have a Geogate setup on a road where only trucks heading to a specific job would drive. The Sales p...
Guest over 1 year ago in Status setup 0 Reviewing